National Freight & Drayage
Transloading cost estimator

Port to destination, one route

Price the whole move: drayage from the terminal, unloading into 53' trailers, optional storage and the outbound trucks to your door. Containers are returned faster and you ship fewer trucks.

01Route

Inbound terminal
Final destination
Destination ZIP
Phoenix, AZ area
Transload facility to destination ≈ 421 mi. Drayage to the facility is ~15 mi.
Vessel ETA or pickup date

02Containers & cargo

Container
Containers
Cargo weight each
lbs
How is it loaded?
Pallets after palletizing (if known)
plts
Commodity

03After the transload

Outbound
Trailer

Estimate only. Not a quote or a live rate. Request a quote for actual pricing.

Estimated logistics plan
Long Beach, CAPhoenix, AZ421 MI
3 × 40' High Cube via transload
Port drayageTransload3 × Dry Van FTL
Estimated planning range
$6,375 – $8,675
1
Port drayage
Long Beach, CA → Transload facility · 15 mi
$2,171
2
Container unload & transload (floor-loaded)
$1,725
3
3 × Dry Van FTL
Transload facility → Phoenix, AZ · 421 mi
$3,465

Good estimateRange ±18%
  • Inbound port or rail terminal
  • Final destination ZIP
  • Cargo weight
  • Pallet or carton count

Cost breakdown ▾
Port drayage
3 × 40' High Cube · 15 mi to facility
$2,171
Transload
3 containers · floor-loaded
$1,725
Outbound truckload
3 trucks · 421 mi
$3,465
Line items show midpoint values. The range above accounts for lane and timing variation.

Costs we can't reliably predict

Demurrage and per diem · Customs exams and holds · Pallets, wrap and dunnage beyond standard · Detention at final delivery. We'll flag any that apply when we quote.


Want an actual rate?

We already have your shipment details. Tell us where to send the quote.

Planning estimate only. Results are based on the shipment information provided and configurable market assumptions. Actual rates depend on current capacity, lane conditions, equipment availability, fuel, terminal requirements, accessorial charges and other shipment-specific factors. This estimate is not a quote, offer or guarantee of service or pricing. Rate table 2026.10-placeholder.

Planning range
$6,375 – $8,675
CallGet a quote