National Freight & Drayage

Manufacturing Logistics for Imported Inputs

Imported components and raw materials drayed, buffered near the port and delivered when the production line needs them.

Manufacturing logistics for imported inputs

Our manufacturing logistics service moves imported components and raw materials from the Ports of Long Beach and Los Angeles into your plant on the production schedule. We dray heavy containers on company-owned triaxle chassis, hold buffer stock in our Long Beach warehouse, keep duty-deferred inventory in our CBP bonded warehouse and release loads by full truckload or LTL as the line consumes them.

For a plant, the cost of a late container is rarely the freight bill. It is idle labor, an expedited air shipment or a missed customer order. Inbound logistics for manufacturers is about protecting the production plan from the variability of ocean shipping: vessel delays, terminal congestion, customs holds and free-time limits.

Where manufacturer import logistics breaks down

Manufacturers importing through Southern California tend to face the same five pressure points. Each has a different fix.

Pressure pointWhat it looks like on the plant floorHow we address it
Vessel and terminal variabilityComponents arrive a week early or two weeks late against a fixed build scheduleHold arrivals as buffer stock near the port and release on your schedule
Heavy, dense freightFasteners, castings, resins or metal stock weigh out before the container is fullTriaxle chassis for heavier containers and weight planning at booking
Duty on inputs not yet neededCash tied up in duty on inventory that sits for monthsBonded storage that defers duty until goods are withdrawn
Mixed SKUs and lotsOne container holds many part numbers or production lots that must stay traceableDevanning by part and lot, barcoded receipt and WMS inventory tracking
Plant receiving limitsSmall docks, narrow receiving windows and no room for a full containerSmaller scheduled loads from our warehouse instead of whole containers

Buffer stock near the port vs. shipping straight to the plant

A production inventory buffer near the port is inventory held between the ocean terminal and the plant, so that ocean timing and production timing are decoupled. Sending every container straight to the plant is cheapest when arrivals are predictable and the plant has room. Holding a buffer costs storage and handling but protects the line when they are not.

The decision usually turns on three numbers: the plant's days of supply on hand, how far ocean arrivals have varied from plan over the last several months, and the daily cost of a line stoppage. When the variability in arrivals exceeds the days of supply, a buffer is cheaper than the stoppages it prevents.

Example: a plant consumes one container of a molded component per week and keeps five working days on hand. Over the last quarter, vessels arrived anywhere from four days early to nine days late. Without a buffer, a nine-day slip means the line runs out. With two containers' worth held in our warehousing operation and released weekly, a late vessel only draws down the buffer. These figures are illustrative.

How scheduled component releases work

Inbound logistics for manufacturers works best as a steady release rhythm. This is how we set it up.

  1. 01
    Define the release rule

    Agree how loads are triggered: a fixed weekly schedule, a minimum quantity on hand at the plant, or release orders from your planners. Each part number gets a unit of measure and pallet configuration.

  2. 02
    Receive and record by part and lot

    We unload containers, count against the packing list, barcode each pallet and record part numbers and lot or heat numbers in our WMS so you can trace any unit back to its container.

  3. 03
    Store to the right status

    Duty-paid inputs go to general storage. Inputs you want to keep duty-deferred go into our bonded warehouse under a warehouse entry filed by your customs broker.

  4. 04
    Build and ship loads

    We pick, palletize or rework loads to fit your plant's receiving rules and ship by FTL, LTL or local truck. Inventory tracking and shipment status updates show what is on hand and what is in transit.

  5. 05
    Report and reorder

    Inventory reports by part and lot let your planners see days of supply near the port and time the next purchase order or the next pre-pull.

Raw material drayage for heavy containers

Raw material drayage is the port pickup and local haul of containers carrying dense inputs such as metal stock, castings, stone, glass or plastic resin. These loads are limited by weight long before they are limited by space, so chassis choice and weight planning matter more than cube.

Federal rules at 23 CFR 658.17 cap gross vehicle weight on the Interstate system at 80,000 pounds, with 20,000 pounds on a single axle and 34,000 pounds on a tandem. A triaxle chassis spreads a heavy container's weight over three axles, which helps keep heavier loads legal on axle weights. We run triaxle chassis for heavier containers and ask for accurate gross weight at booking so the right chassis is on the first appointment.

For heavy freight, transloading into 53-foot trailers rarely saves trucks because the trailer weighs out at about the same payload as the container. Our transloading vs. cross-docking guide explains when the move pays off.

Bonded storage and duty timing for manufacturers

A CBP bonded warehouse lets you store imported inputs without paying duty until you withdraw them for consumption. Under 19 U.S.C. 1557, merchandise may stay in a bonded warehouse for up to five years from the date of importation. For a manufacturer holding a long-lead component in bulk, that turns a single large duty payment into smaller payments that follow actual usage.

Goods can also be withdrawn from bond for export without paying US duty, which matters if some inputs are shipped to plants in Mexico or Canada. We provide the bonded storage and the bonded drayage to get cargo there; your customs broker files the warehouse entry and withdrawals. Read more about how a bonded warehouse works or see our bonded warehousing in Long Beach.

Manufacturers that export finished goods may also qualify for duty drawback. Under 19 CFR 190.21, manufacturing drawback can refund up to 99 percent of the duties, taxes and fees paid on imported inputs used in exported products. Drawback claims are filed through a licensed customs broker or drawback specialist; our role is keeping clean receiving and lot records that support the paper trail.

Common mistakes in manufacturing logistics

  • Under-declared weight. A container booked as standard weight that needs a triaxle chassis can miss its appointment. Give gross weight from the packing list, including crates and dunnage.
  • Non-compliant wood packaging. USDA APHIS requires wood pallets and crates to be treated and carry the ISPM 15 mark. Noncompliant packaging can be refused entry, so confirm the mark with suppliers of crated machinery or parts.
  • One part number per pallet assumption. Mixed pallets from suppliers slow receiving. Ask suppliers to label cartons with part and lot numbers, or plan for sorting at our warehouse.
  • Planning to the ETA instead of the last free day. Vessels and holds slip. Plan around the last free day and let us pre-pull containers when the plant cannot receive in time.
  • Splitting providers. Using one company for drayage and another for storage adds a move and a handoff. Keeping drayage, storage and delivery together shortens the chain.

Plan your inbound component flow

Tell us your plant locations, monthly container volume, typical weights and days of supply, and we will propose a drayage, storage and release plan. Call 888-718-9559.

Get a manufacturing logistics quote

Frequently asked questions

Can you store components near the port and release them on a schedule?

Yes. We store inventory in our Long Beach warehouse and release it on a fixed schedule, by minimum stock levels at your plant or on release orders from your planners.

Can you handle heavy containers?

Yes. We run company-owned triaxle chassis for heavier containers, along with 20-foot and 40-foot chassis. Accurate gross weight at booking lets us assign the right chassis the first time.

Can imported inputs be stored without paying duty right away?

Yes, in a CBP bonded warehouse. Duty is paid when goods are withdrawn for consumption, and goods may stay for up to five years from importation. Your customs broker files the warehouse entry and withdrawals.

Do you track inventory by lot or heat number?

Yes. We record part and lot details at receipt in our warehouse management system and barcode each pallet, so you can trace a unit back to its container and receiving date.

Can you deliver to plants outside Southern California?

Yes. We ship by FTL and LTL nationwide and offer cross-border service to Canada and Mexico for manufacturers with plants or suppliers there.

Can you repalletize or rework loads for our receiving dock?

Yes. We sort, palletize, relabel and reconfigure freight to match your plant's pallet height, label and load requirements before it ships.

Is it cheaper to send containers directly to the plant?

Often, when arrivals are predictable and the plant has dock space and storage. A buffer near the port makes sense when ocean variability exceeds your days of supply or the plant cannot receive full containers.