Get a quoteHow to Import Through Long Beach and Los Angeles: The Complete Guide
Every U.S.-side step of a San Pedro Bay import, from booking and ISF to customs entry, holds, free time, drayage, in-bond moves, warehousing, delivery and the bills that follow.
How to import through Long Beach and Los Angeles: the short answer
Learning how to import through Long Beach and Los Angeles comes down to managing about a dozen U.S.-side steps in the right order: file the Importer Security Filing before the container is loaded overseas, have a licensed customs broker file entry backed by a customs bond, clear every hold before the container's free time ends, pick the container up with a drayage carrier that has a terminal appointment and a chassis, then unload, store or forward the freight and return the empty on time. Every step has a deadline, and most of the avoidable cost in a West Coast import comes from missing one of them.
The two ports sit side by side in San Pedro Bay and operate as separate agencies, but the process is the same at both. The Port of Los Angeles handled more than 10.2 million TEUs in 2025 and the Port of Long Beach about 9.9 million, so together they move roughly 20 million TEUs a year, most of it from Asia. That volume is why the gateway works well when shipments are planned and why it punishes shipments that are not.
This import freight guide is written for importers, freight forwarders, customs brokers and logistics managers who want the full picture of the San Pedro Bay import process. It is vendor-neutral. It explains who files what, which regulations apply, what each charge is for, and where the decision points are. Where a step involves a service we provide from Long Beach, we link to it, and the rest of the guide stands on its own.
The San Pedro Bay import process at a glance
A typical full-container-load (FCL) import from Asia moves through these stages. Timing is relative to vessel loading and arrival, and every shipment varies.
| Stage | When | Who is responsible | What can go wrong |
|---|---|---|---|
| Classification and landed-cost check | Before the purchase order is final | Importer, with customs broker | Wrong tariff number or missed duty action changes the landed cost |
| Customs bond in place | Before the ISF is filed | Importer through broker or surety | No bond means no ISF and no entry |
| Ocean booking and cargo ready | 2 to 6 weeks before sailing | Shipper, forwarder or NVOCC | Rolled bookings, missed cutoffs |
| Importer Security Filing (ISF) | At least 24 hours before loading overseas | Importer or its agent | Late or inaccurate ISF can draw liquidated damages |
| Customs entry | Before arrival, or within 15 calendar days of it | Licensed customs broker | Late entry pushes cargo toward general order |
| Arrival and discharge | Day 0 | Ocean carrier and terminal operator | Rolled discharge, vessel diverted to the other port |
| Holds cleared | Day 0 to free-time end | Broker, carrier, importer | Exams or unpaid freight stop pickup |
| Terminal pickup | Before the last free day | Drayage carrier | No appointment, no chassis, demurrage starts |
| Unload, transload or store | Day of pickup to a few days after | Warehouse, CFS or transloader | Containers held too long accrue detention |
| Empty return | Before per diem free time ends | Drayage carrier | Return locations closed or full |
| Final delivery | Same day to a week or more | FTL or LTL carrier | Missed delivery appointments, rework |
| Entry summary, duty payment and liquidation | Entry summary within 10 working days of entry; liquidation usually about a year later | Customs broker and importer | Post-entry corrections, rate changes, bond issues |
Who does what on a Long Beach or Los Angeles import
Most delays come from a handoff where two parties each assume the other is handling something. This is the standard division of responsibility.
| Party | Role | Key outputs |
|---|---|---|
| Importer of record (IOR) | Legally responsible for the entry, duties, admissibility and reasonable care | Commercial invoice, classification decisions, payment of duties, the customs bond |
| Licensed customs broker | Files ISF (often), entry and entry summary in ACE on the importer's behalf under a power of attorney | Entry, release, duty statement, responses to CBP requests |
| Freight forwarder or NVOCC | Books ocean freight, issues house bills of lading, coordinates origin and often destination services | Booking, bill of lading, arrival notice |
| Ocean carrier | Moves the container, sets line free time and per diem, releases freight | Master bill of lading, freight release, D&D invoices |
| Marine terminal operator | Discharges, stores and releases containers, runs the appointment system | Availability status, terminal holds, terminal demurrage |
| Drayage carrier | Picks up and returns containers by truck, supplies or arranges the chassis | Pickup, delivery, empty return, chassis |
| Bonded carrier | Moves goods that have not cleared customs under an in-bond | In-bond movement and arrival reporting |
| CFS, bonded warehouse or FTZ operator | Receives, devans and stores goods, bonded or cleared | Receiving reports, inventory, releases |
| Surety | Underwrites the customs bond and guarantees payment to CBP | Single-transaction or continuous bond |
Planning and booking before the cargo ships
Most problems that show up at the terminal were set in motion at origin. Planning the import before the cargo ships means settling six things.
- 01Confirm classification and landed cost
Every product needs a Harmonized Tariff Schedule (HTS) number before it ships. The number sets the duty rate and tells your broker whether any trade actions apply, such as Section 301 duties, antidumping or countervailing duties, or quotas. Tariff rates on some origins have changed several times in recent years, so confirm the current rate with your broker for each shipment instead of relying on last year's landed-cost sheet.
- 02Settle Incoterms and who controls the freight
Under FOB or FCA terms, the buyer books the ocean freight and controls the forwarder, which makes it easier to coordinate the U.S. side. Under CIF or CFR, the seller's forwarder controls the booking and destination charges can arrive as surprises. Under DDP, the seller acts as importer of record, which only works if the seller has a U.S. bond and a broker.
- 03Put a customs bond in place
A bond must exist before the ISF and entry can be filed. A first-time importer can buy a single-transaction bond for one shipment or a continuous bond that covers a year of entries. Continuous bonds take time to be approved, so arrange one before the first booking if more shipments are coming.
- 04Check other agency requirements
Food, cosmetics, medical devices, children's products, chemicals, plants and wood products may need data or permits for FDA, CPSC, EPA, USDA or other partner government agencies. Missing data does not stop the vessel. It stops the release, while free time keeps running.
- 05Decide how the container is loaded
Floor-loaded cartons maximize cube and lower ocean cost per unit, and palletized loads speed unloading and receiving. Choose deliberately, because the decision determines how long unloading takes and whether the freight can be live unloaded at a customer's dock. Any wood pallets or crating must meet the ISPM 15 international standard and carry the treatment mark, or the shipment can be delayed or refused entry.
- 06Pick the U.S.-side path before the vessel sails
Decide whether the container will go straight to your door, to a transloader near the port, to a CFS, to a bonded warehouse, or inland in bond. Booking drayage and warehouse capacity after arrival is the most common reason containers miss their last free day.
What is ISF 10+2 and when must it be filed?
The Importer Security Filing, called ISF or 10+2, is advance cargo data that U.S. Customs and Border Protection requires for ocean shipments, and it must be transmitted at least 24 hours before the cargo is loaded on the vessel at the foreign port. The requirement is set out in 19 CFR Part 149. The importer, called the ISF importer, is responsible for it, and in practice a customs broker or forwarder usually files it.
The importer supplies ten data elements, and the ocean carrier supplies two: the vessel stow plan and container status messages. Two of the importer's ten elements, the container stuffing location and the consolidator, may be submitted later, up to 24 hours before the vessel arrives in the United States. Shipments that will move in bond to be exported or will go into a foreign-trade zone use a shorter five-element filing, often called ISF-5.
A late, inaccurate or incomplete ISF can draw liquidated damages of $5,000 per violation against the importer's bond, and CBP may also place a hold on the cargo. The practical fix is simple: get the supplier's data on the manufacturer, seller, ship-to party and HTS numbers when the purchase order is placed, and give your filer the booking details as soon as the forwarder has them.
The ten importer ISF data elements
Collect these before the cargo is ready. Most come from the supplier and the purchase order.
- Seller: the last known entity that sold or agreed to sell the goods.
- Buyer: the last known entity that bought or agreed to buy the goods.
- Importer of record number or foreign-trade zone applicant ID.
- Consignee number: the IRS, EIN, SSN or CBP-assigned number of the consignee.
- Manufacturer or supplier: name and address of the entity that made, assembled or grew the goods.
- Ship-to party: the first deliver-to party in the U.S. after release.
- Country of origin of each product.
- HTS number to at least the six-digit level.
- Container stuffing location: where the container was physically loaded.
- Consolidator: the party that stuffed the container or arranged for it.
Documents needed to import through Long Beach
These are the core documents for an ocean FCL import. Your broker may ask for more depending on the product and the agencies involved.
| Document | Issued by | Used for |
|---|---|---|
| Commercial invoice | Seller | Customs value, description, origin and terms of sale; the basis of the entry |
| Packing list | Seller | Carton counts, weights and contents; used by the broker, CBP exams and the warehouse |
| Bill of lading (master and house) | Ocean carrier and forwarder or NVOCC | Title and release of the cargo; container and seal numbers |
| Arrival notice | Carrier or forwarder | Vessel, ETA, terminal and freight charges due |
| Power of attorney | Importer | Authorizes the broker to file in the importer's name |
| Customs bond | Surety | Required for ISF and formal entry |
| Certificate of origin or supplier declarations | Seller or manufacturer | Supports origin claims, trade-program eligibility and enforcement reviews |
| Agency documents | Seller, lab or importer | FDA, USDA, CPSC, EPA or other data, certificates and test reports |
| Delivery order | Importer, forwarder or broker | Tells the drayage carrier what to pick up, where to deliver and any appointment details |
Customs entry and bonds: who files what
A licensed customs broker files the customs entry on the importer's behalf, and the importer of record remains legally responsible for it. Brokers are licensed and regulated by CBP under 19 CFR Part 111, and they need a power of attorney from the importer before they can file. Drayage carriers, warehouses and forwarders that are not licensed brokers do not file entries, although they handle the physical cargo that the entry releases.
Merchandise that requires entry must be entered within 15 calendar days after it is landed, under 19 CFR 142.2. For goods moved in bond, the 15 days run from arrival at the destination port. Entry is usually filed before the vessel arrives so CBP can release the cargo on arrival. The entry summary, CBP Form 7501 data with estimated duties, follows within 10 working days of entry under 19 CFR 142.12, and most importers pay through the broker's account or the ACH periodic monthly statement.
If nothing is filed within 15 days, 19 CFR 4.37 lets the carrier send the cargo to a general order warehouse at the risk and expense of the consignee. General order storage is expensive and slow to unwind, and goods that stay unclaimed can eventually be sold. Shipments rarely get that far, but containers that sit at a terminal while an importer argues with a supplier over documents do.
After the entry summary is filed, CBP reviews it and liquidates the entry, which fixes the final duty. Liquidation usually happens about a year after entry. Errors found before liquidation can be fixed with a post-summary correction, and duties may be adjusted up or down at liquidation.
Common entry types for San Pedro Bay imports
| Entry type | Code | When it is used |
|---|---|---|
| Formal consumption entry | 01 | Most commercial imports valued over $2,500; duty is paid and goods enter U.S. commerce |
| Informal entry | 11 | Commercial shipments valued at $2,500 or less (19 CFR 143.21), with exceptions for goods subject to certain trade actions |
| Antidumping or countervailing duty entry | 03 | Goods covered by an AD/CVD order; cash deposits are paid at entry |
| Warehouse entry | 21 | Goods placed in a customs bonded warehouse with duty deferred until withdrawal |
| Warehouse withdrawal for consumption | 31 | Goods taken out of a bonded warehouse for U.S. sale; duty is paid then |
| FTZ consumption entry | 06 | Goods leaving a foreign-trade zone for U.S. commerce |
| In-bond (IT, IE, T&E) | 61, 62, 63 | Goods moving under bond to another port, to export, or through the U.S. without entry at the arrival port |
How customs bonds work and how big yours should be
A customs bond is a contract between the importer, a surety company and CBP that guarantees duties, taxes, fees and penalties will be paid. A single-transaction bond covers one entry and is usually sized to the value of the shipment plus duties, or a higher multiple when other agency requirements apply. A continuous bond covers every entry for a year.
CBP generally sets a continuous bond at 10 percent of the duties, taxes and fees the importer paid over the previous twelve months, with a $50,000 minimum, rounded up. An importer that paid $900,000 in duties would typically need a $90,000 bond. CBP reviews sufficiency on a rolling basis, so a sharp increase in tariffs can make a bond insufficient before its anniversary. Importers whose duty bill has risen should ask their broker to check bond sufficiency before CBP sends a notice, because an insufficient bond can block new entries.
Duties are only part of the customs bill. Ocean imports also pay the Merchandise Processing Fee of 0.3464 percent of the entered value, subject to a minimum and maximum that CBP adjusts every fiscal year, and the Harbor Maintenance Fee of 0.125 percent of the cargo value, which has no cap. Your broker will show each line on the entry summary.
Arrival, discharge and availability
A container is available for pickup when it has been discharged from the vessel, all holds are released, and the terminal shows it as ready for an appointment. Discharge and availability are different events. A large vessel can take several days to work, and a container discharged on the first day may not be released until the last.
The Port of Long Beach import process and the Los Angeles process start the same way: the ocean carrier or forwarder sends an arrival notice a few days before arrival with the vessel, voyage, estimated arrival, terminal, and any freight charges due. Track the container on the terminal's own website or a visibility platform as the vessel approaches, because the terminal record, not the carrier's schedule, is what the drayage carrier and appointment system use.
Vessels sometimes change berths between the two ports on short notice. Because the ports are separate agencies with their own terminals, a diversion can change the terminal, the appointment system and the empty return location. When importing through Los Angeles or Long Beach, use a drayage provider that works both ports so a diversion only changes the route. Our Port of Long Beach and Port of Los Angeles pages describe how we cover each side of the harbor.
Holds that stop a container from leaving the terminal
A container with any open hold cannot be picked up, even if the vessel discharged days ago. Most terminals show the hold type in the container status.
| Hold | What it means | Who clears it | How to prevent it |
|---|---|---|---|
| Customs hold | CBP has not released the entry, or has flagged the container for exam | Customs broker with CBP | File entry early with complete data and a sufficient bond |
| Freight or line hold | Ocean freight or carrier charges are unpaid, or original bills of lading have not been surrendered | Ocean carrier or forwarder | Pay freight and arrange telex or express release before arrival |
| Terminal hold | Terminal demurrage or other terminal charges are unpaid | Terminal operator | Pay charges or confirm the payer before pickup day |
| Partner agency hold | FDA, USDA, CPSC or another agency needs data or an inspection | Broker with the agency | Transmit full agency data with the entry |
| Exam hold | CBP selected the container for X-ray, a tailgate exam or an intensive exam | CBP; broker coordinates | No guaranteed prevention; accurate data and a good compliance history help |
| ISF hold | Missing or late ISF | ISF filer with CBP | File complete ISF on time |
What happens when CBP examines a container?
CBP examines containers in three main ways: a non-intrusive X-ray or gamma-ray scan, a tailgate exam where officers open the doors and inspect what they can reach, and an intensive exam where the container is moved to a Centralized Examination Station and unloaded. Scans often clear within a few days. Intensive exams take longer because the container must be drayed to the station, scheduled, unloaded, examined and reloaded.
The importer pays the station's handling charges and the drayage to and from it, even when nothing is wrong with the shipment. Free time does not stop during an exam unless the terminal or carrier agrees otherwise, so exams are a common source of demurrage disputes. Keep the exam notice and dates, because they matter if you later contest a charge under the FMC billing rule described below.
Terminal appointments, peak hours and port fees
Every container terminal in San Pedro Bay requires a truck appointment for import pickups and empty returns, and appointments for a given day can sell out during busy periods. The drayage carrier books them, so the earlier the carrier knows a container is coming, the more choice it has. Many carriers try to pair an import pickup with an empty return in one visit, called a dual transaction, to cut turn time.
Two port-related charges commonly appear on drayage invoices. The ports' Clean Truck Fund rate is charged on loaded containers moved by truck through the terminals, and a traffic mitigation fee applies to many moves during peak daytime hours under the terminals' off-peak program. The amounts change and some cargo is exempt, so check the current rates on the port and program websites rather than relying on an old quote.
Terminal gate hours and appointment windows vary by terminal and season. A container that is released on a Friday afternoon may not have a usable appointment until Monday, which is why free-time math has to account for the terminal calendar and not just the calendar on the wall.
Free time and the last free day
Free time is the number of days a container may sit at the terminal, or be held outside it, before daily charges start, and the last free day (LFD) is the final day of that allowance. After the LFD, the container accrues demurrage at the terminal. After it leaves the terminal, a separate clock runs on the equipment until the empty is returned, usually called detention or per diem.
Free time is set by the ocean carrier's tariff or service contract, and sometimes by the terminal, and it usually starts at discharge or availability. Typical import free time at the San Pedro Bay ports is a handful of days, and it differs by carrier, contract and terminal. Whether weekends and holidays count is defined in the tariff. The last free day guide explains how to read the LFD on a terminal record and how to calculate it.
The LFD should drive every other date in the plan. If entry, freight release, appointment and pickup are all scheduled to happen on the LFD itself, any one slip turns into charges. Aim to have holds cleared and the container picked up with at least a day of margin, and if that is not possible, decide early whether to pre-pull the container to a yard.
Drayage options for San Pedro Bay containers
Drayage is the short-haul truck move between the terminal and the first stop. The what is drayage guide covers the basics; this table compares the delivery methods.
| Option | How it works | Best for | Watch out for |
|---|---|---|---|
| Live unload | The driver waits while the receiver unloads, then takes the empty | Palletized loads and docks that can unload in a couple of hours | Waiting time charges if unloading runs long; floor-loaded boxes take much longer |
| Drop and pick | The loaded container is left on its chassis at the receiver and picked up empty later | Floor-loaded cartons, receivers with yard space | Chassis and detention clocks keep running while the box sits |
| Pre-pull to a yard | The container is pulled before the LFD and parked at the carrier's yard, then delivered later | Receivers who cannot take delivery before the LFD, or terminal congestion | Yard storage and an extra move; still cheaper than demurrage in most cases |
| Delivery to a transloader or CFS | The container goes to a nearby facility for unloading and reloading | Freight going to several destinations or into domestic trailers | Handling charges; requires a clear plan for the outbound freight |
| In-bond move | A bonded carrier moves uncleared goods to a bonded facility or another port | Entry not ready, or inland clearance planned | Requires bonded carrier authority and an in-bond filing |
| Street turn | An empty from one import is reused for a nearby export without returning to the terminal | Shippers and carriers with matched export bookings | Requires carrier approval; not always available |
For the national view of how drayage is quoted and how to choose a provider, see container drayage services. For how the work runs at each port, see drayage at the Port of Long Beach and Port of Los Angeles drayage. If a container needs to leave the terminal before the receiver is ready, container storage and pre-pulls are the standard tool.
Chassis: the piece of equipment people forget
A chassis is the wheeled frame a container rides on over the road, and no container leaves the terminal without one. In the United States, chassis are mostly supplied by leasing companies through shared pools or by motor carriers that own their own, while ocean carriers have largely stopped providing them. Chassis are billed by the day, so a container that sits at a receiver on its chassis accrues both container detention and chassis charges.
Chassis shortages show up during peaks and at specific terminals. Carriers with their own chassis fleet avoid hunting for pool equipment, and they can match the chassis to the load: 20-foot and 40-foot chassis for standard boxes, and triaxle or tri-axle chassis for heavy containers that would otherwise exceed axle limits.
Weight matters here. Federal rules for the Interstate System cap gross vehicle weight at 80,000 pounds, with 20,000 pounds on a single axle and 34,000 pounds on a tandem, under 23 CFR 658.17. A heavy 20-foot container of tile, metal or paper can exceed those limits on a standard chassis. Give your drayage carrier the actual cargo weight at booking so it can assign the right equipment or arrange for the load to be transloaded.
In-bond options: moving cargo that has not cleared customs
An in-bond shipment is imported cargo that leaves the port of arrival without being entered there, moving under a bond to another port, a bonded facility, or out of the country. The rules are in 19 CFR Part 18. In-bond requests must be filed electronically, the goods must be delivered to the destination within 30 days of arrival or movement authorization, and arrival at the destination must be reported to CBP within two business days.
There are three in-bond types. An Immediate Transportation (IT) moves goods to another U.S. port where they will be entered. An Immediate Exportation (IE) moves goods directly out of the U.S. from the arrival port. A Transportation and Exportation (T&E) moves goods across the U.S. to be exported at another port, such as a shipment from Long Beach to Mexico or Canada.
Locally, in-bond moves are most often used to take a container from the terminal to a nearby customs-bonded warehouse or CFS when entry is not ready, when the cargo is going to be exported, or when the importer wants to defer duty. The carrier must hold bonded carrier authority. Our in-bond shipments guide goes deeper, and bonded drayage explains how the truck move works.
Bonded warehouses vs foreign-trade zones
Both let you hold imported goods without paying duty until they enter U.S. commerce. They differ in time limits, what you can do to the goods, and how entries are filed.
| Factor | Customs bonded warehouse | Foreign-trade zone (FTZ) |
|---|---|---|
| Legal basis | 19 U.S.C. 1555–1557; 19 CFR Part 19 | Foreign-Trade Zones Act; 19 CFR Part 146 |
| Time limit | Up to 5 years from the date of importation | No time limit |
| Duty timing | Paid when goods are withdrawn for consumption, at the rate in effect on withdrawal | Paid when goods leave the zone for U.S. commerce |
| Duty on re-export | None if goods are exported from the warehouse | None if goods are exported from the zone |
| Allowed activities | Storage; cleaning, sorting, repacking in a Class 8 facility; no manufacturing | Storage, manipulation, and with approval, manufacturing |
| Entry filing | Warehouse entry (type 21) and withdrawals per release | Admissions plus consumption entries, with weekly entry available |
| Setup effort | Use an existing public bonded warehouse (Class 3) | Zone or subzone activation with CBP and the FTZ Board; significant compliance program |
| Typical user | Importers who need months, not years, of deferral or need to re-export | High-volume importers or manufacturers with steady, long-term flows |
Recent tariff actions add a wrinkle. Goods subject to certain trade remedies must be admitted to an FTZ in privileged foreign status, which locks in the duty rate on the day of admission. If rates later fall, those goods do not benefit. In a bonded warehouse, the duty rate is set on the day of withdrawal, so an importer expecting a rate decrease may prefer the warehouse. Confirm the treatment of your specific goods with your broker before choosing.
For most importers coming through San Pedro Bay, a public bonded warehouse is the faster option because it requires no setup. See what is a bonded warehouse for the mechanics and bonded warehousing services for how storage and withdrawals are handled.
CFS and LCL imports
A container freight station (CFS) is a warehouse where consolidated ocean containers are unloaded and the shipments inside are separated and released to each consignee. Less-than-container-load (LCL) cargo always moves through a CFS, and CFS operations are regulated by CBP under 19 CFR Part 19 alongside bonded warehouses.
For an LCL importer, the CFS replaces the terminal as the pickup point. The consolidated container is drayed from the terminal to the CFS, devanned, and each house bill is held until customs and the forwarder release it. CFS free time is usually short and storage charges are per shipment or by weight and volume, so LCL importers should have entry filed and a pickup carrier lined up before the container is devanned.
Importers also use a CFS in reverse: buying from several suppliers and consolidating into one container at origin, then deconsolidating in Long Beach and distributing to several destinations. The what is a container freight station guide explains the flow, and container freight station services and freight consolidation cover the handling.
Transloading near the port vs moving the container inland
Transloading means unloading an ocean container near the port and reloading the freight into a domestic 53-foot trailer or several trucks. The alternative is to send the ocean container directly to the final destination.
| Factor | Transload near the port | Move the ocean container inland |
|---|---|---|
| Capacity per move | A 53-foot trailer holds substantially more cube than a 40-foot container, so fewer outbound loads | One container, one load |
| Equipment clock | Ocean container returned within days | Detention and chassis charges run until the empty comes back, often from far away |
| Splitting freight | Easy to split by SKU, PO or destination | Not possible without another handling stop |
| Handling cost | Adds unloading, palletizing and reloading | None until destination |
| Damage exposure | One more touch | Fewer touches |
| Best fit | Freight going far inland, to several DCs, or needing rework | Single-destination loads within a short drive of the port |
Transloading is the default for freight going a long way inland from Southern California, because the domestic trailer carries more and the ocean container goes home early. Direct delivery usually wins for single-destination loads to receivers in the Los Angeles basin and the Inland Empire. The transloading vs cross-docking guide explains how the two differ, and transloading services and cross-docking cover the operations.
Warehousing near the ports
Warehousing near the ports gives importers a buffer between vessel arrival and customer demand, and it is often the cheapest way to stop paying demurrage and detention while a sales or allocation decision is made. A warehouse close to the terminals also shortens the drayage leg, which lowers per-move cost and makes it easier to turn containers the same day.
Ask any port-area warehouse how it receives floor-loaded containers, how quickly it reports receipts, whether it can palletize, relabel and sort, and how inventory is tracked and released. A warehouse management system with barcode receiving matters more than square footage when you are trying to ship specific purchase orders to specific customers. Our warehousing and storage and container unloading pages describe what that looks like in practice.
Inland trucking after the port
Once freight is out of the ocean container, it moves like any domestic shipment: full truckload when it fills a trailer or is going to one receiver, and LTL when it is a few pallets. Most transloaded freight moves FTL in 53-foot dry vans. The FTL vs LTL guide explains the tradeoffs and pricing basis, including freight classification for LTL.
Driver hours limit how far a load can travel each day. Federal hours-of-service rules let a property-carrying driver drive up to 11 hours within a 14-hour on-duty window after 10 consecutive hours off, with a 30-minute break after 8 hours of driving and weekly limits of 60 or 70 hours. A load from Southern California to the Midwest or East Coast is a multi-day trip for a solo driver, so build that into delivery promises. See full truckload, LTL freight and nationwide trucking for the services.
Demurrage, detention and the FMC billing rule
Demurrage is charged for a loaded container that stays at the terminal past its free time, and detention or per diem is charged for keeping the carrier's container outside the terminal past its free time. Both are charged per container per day, often at rates that step up the longer the container is held. The demurrage and detention guide explains the mechanics and how the clocks interact.
Since May 28, 2024, ocean carriers and marine terminal operators that bill demurrage or detention must follow the Federal Maritime Commission's billing rule at 46 CFR Part 541. The rule limits who can be billed to the party for whose account the transportation or storage was provided, or the consignee, but not both. Ocean carriers must issue the invoice within 30 days of the date the charges were last incurred, and an NVOCC passing through a carrier's charges has 30 days from receiving the carrier's invoice. The billed party then has at least 30 days to dispute, and the billing party must respond within 30 days of the dispute.
Invoices must include specific information, such as the bill of lading and container numbers, the free time allowed, the dates charged, the applicable daily rates and tariff or contract, a dispute contact, and a certification that the billing party's own performance did not cause or contribute to the charges. If a required element is missing, the billed party has no obligation to pay that charge. Check every D&D invoice against the rule before paying, keep terminal records showing appointment availability, and dispute in writing within the window.
Import cost planning: the full cost stack
These are the U.S.-side cost categories to plan for on an FCL import. Amounts vary widely by commodity, carrier, season and service level, so use this as a checklist, not a quote.
| Cost | Billed by | What drives it |
|---|---|---|
| Duties | CBP through broker | HTS classification, origin, trade actions, customs value |
| Merchandise Processing Fee | CBP through broker | 0.3464% of entered value, within annual minimum and maximum |
| Harbor Maintenance Fee | CBP through broker | 0.125% of cargo value on ocean imports |
| Customs brokerage and ISF filing | Customs broker | Number of lines, agency filings, complexity |
| Customs bond | Surety through broker | Single-transaction or annual continuous premium |
| Destination charges | Forwarder or carrier | Terminal handling, documentation, CFS charges for LCL |
| Drayage line haul | Drayage carrier | Distance, port, appointment difficulty |
| Fuel surcharge | Drayage carrier | Diesel price index |
| Chassis | Drayage carrier or pool | Days the container is on the chassis; triaxle for heavy loads |
| Port fees | Drayage carrier pass-through | Clean Truck Fund rate, peak-hour traffic mitigation fee |
| Pre-pull and yard storage | Drayage carrier | Days stored before delivery |
| Waiting time | Drayage carrier | Time over the free window at pickup or delivery |
| Demurrage and detention | Terminal or ocean carrier | Days past free time |
| Exam costs | CES and drayage carrier | Exam type, handling, extra drayage |
| Unloading, palletizing, labeling | Warehouse, CFS or transloader | Floor-loaded vs palletized, carton count, labor |
| Storage | Warehouse | Pallet positions and time held |
| Outbound trucking | FTL or LTL carrier | Distance, weight, class, accessorials |
Worked example: landed cost of one 40-foot container
Example only. Every number below is hypothetical and rounded to show the arithmetic. These are not our prices or anyone's quote; use your own broker's and carriers' figures.
- 01The shipment
A 40-foot container of household goods with a customs value of $60,000 arrives at Long Beach. Assume a hypothetical combined duty rate of 10 percent. The freight is floor-loaded, about 1,500 cartons, and is going to two distribution centers: one in the Inland Empire and one in Texas.
- 02Customs costs
Duty at 10 percent is $6,000. The MPF at 0.3464 percent is about $208, which sits between the annual minimum and maximum. The HMF at 0.125 percent is $75. Assume $300 for brokerage and ISF filing and $100 for a single-transaction bond. Customs-related costs total about $6,683.
- 03Plan A: on time
The container is released two days after discharge and picked up a day before the LFD. Assume drayage to a transloader near the port, chassis and port fees total $900. Unloading, palletizing and reloading 1,500 floor-loaded cartons into two trailers costs $1,000. Outbound: $800 to the Inland Empire and $4,000 to Texas. U.S.-side logistics total $6,700, and there is no demurrage or detention.
- 04Plan B: one slip
Same shipment, but a missing commercial invoice delays entry. The container sits four days past the LFD. At a hypothetical $200 per day, demurrage is $800. The broker files late, the receiver was not told, and the container is then dropped at the receiver for three days past detention free time, adding $450 of detention and chassis at a hypothetical $150 per day. The same freight now costs $1,250 more, about 19 percent above Plan A's logistics cost, and nothing about the freight changed.
- 05Plan C: bonded storage
If the entry problem had been known on arrival, the container could have moved in bond to a bonded warehouse before the LFD. Assume an extra $300 for the bonded move and bonded receiving and $150 for two weeks of storage. That is $450 instead of $1,250, and it buys time to fix the paperwork. When the delay is long or open-ended, bonded storage usually wins; when it is a day or two, a pre-pull may be cheaper.
- 06What to take from it
Duty is the largest line, and you control it mostly through correct classification and origin. The logistics line is where small slips multiply. Track the LFD from the day the vessel sails, and decide on the fallback (pre-pull or bonded storage) before you need it.
Peak season and disruption planning
Trans-Pacific import volume peaks in late summer and early fall as retailers build inventory for the holiday season, and it spikes again before Chinese New Year, when factories across China and much of Asia close for one to several weeks. Expect tighter vessel space, higher spot ocean rates, peak-season surcharges, fuller terminal appointment calendars and fewer available chassis during these windows.
Other events cause spikes too: blank sailings that bunch cargo onto fewer vessels, tariff deadlines that pull imports forward, labor negotiations at West Coast ports, and weather or congestion at origin. The ports handle these by adjusting gate hours and appointments, and importers handle them by booking drayage and warehouse space earlier and widening the margin before the LFD.
A useful peak-season rule: book drayage when the vessel sails, not when it arrives, and confirm the receiver's dock capacity for the week of arrival. If receivers cannot absorb the surge, plan a pre-pull or near-port storage for the overflow instead of letting containers sit at the terminal.
Common mistakes when importing through Long Beach and Los Angeles
These account for most of the avoidable cost and delay we see on San Pedro Bay imports.
- Filing ISF from estimates. Using last order's manufacturer or HTS numbers produces inaccurate filings. Update the ISF when the supplier's data changes.
- Waiting to arrange a bond. First-time importers often discover the bond requirement after the vessel sails. Set it up first.
- Treating the LFD as a target. Plan pickup for at least a day before the LFD so one late hold does not create charges.
- Forgetting freight release. Customs release is not enough if ocean freight is unpaid or original bills have not been surrendered.
- Not giving the trucker the weight. An overweight container on the wrong chassis cannot move legally. Share actual weight at booking.
- Dropping containers without a return plan. Every day a drop sits at the receiver adds detention and chassis charges. Agree on unload times before delivery.
- Assuming LCL is released when the vessel is. LCL cargo is released by the CFS after devanning, which can take several days after vessel discharge.
- Ignoring partner agency data. FDA, USDA and CPSC holds stop release just like customs holds.
- Untreated wood packaging. Pallets and crates without the ISPM 15 mark can lead to delays, re-export or refused entry.
- Paying D&D invoices without checking them. Under 46 CFR 541, invoices missing required information do not have to be paid. Check them, and dispute within the window.
- Ignoring bond sufficiency after tariff increases. Higher duty bills can make a continuous bond insufficient mid-year. Have the broker review it.
- Choosing transload or direct delivery by habit. Run the numbers for each lane; the right answer changes with destination, freight mix and season.
Pre-arrival checklist for importing through Long Beach or Los Angeles
Use this as the week-of-sailing and week-of-arrival checklist for every container.
| Item | Owner | Deadline | Done when |
|---|---|---|---|
| HTS numbers and duty rate confirmed | Importer and broker | Before booking | Broker has confirmed classification and any trade actions |
| Customs bond active and sufficient | Importer and broker | Before ISF | Bond on file in ACE and sized to current duties |
| Power of attorney to broker | Importer | Before ISF | Broker can file in your name |
| ISF filed | ISF filer | 24 hours before loading | Filing accepted; stuffing location and consolidator added by 24 hours before arrival |
| Commercial invoice and packing list received | Supplier and importer | At sailing | Broker has final documents |
| Agency data and permits ready | Importer and broker | Before entry | FDA, USDA, CPSC or other data ready to transmit |
| Entry filed | Customs broker | Before arrival if possible | Entry accepted and release expected on arrival |
| Ocean freight paid and release arranged | Importer or forwarder | Before arrival | No freight hold shows on the container |
| Drayage booked with weight and destination | Importer or forwarder | At sailing | Carrier has the bill of lading, container number, weight and delivery plan |
| Warehouse or receiver appointment confirmed | Importer | Before arrival | Receiver knows date, load type and unload time |
| LFD confirmed on the terminal record | Drayage carrier or importer | On availability | LFD and pickup date set with margin |
| Fallback plan agreed | Importer | Before arrival | Pre-pull or bonded storage decision made if holds persist |
| Empty return location checked | Drayage carrier | Day of unload | Return terminal and appointment confirmed |
Glossary of key import terms
Plain definitions of the terms used in this guide. The full logistics glossary has more.
| Term | Definition |
|---|---|
| ACE | Automated Commercial Environment, CBP's electronic system for entries, ISF and in-bond filings |
| Arrival notice | Notice from the carrier or forwarder that a shipment is arriving, with charges due |
| Bonded carrier | A trucking company authorized to move goods that have not cleared customs |
| Chassis | The wheeled frame that carries a container on the road |
| CES | Centralized Examination Station, where CBP conducts intensive exams |
| CFS | Container freight station, where consolidated containers are unloaded and LCL shipments released |
| Continuous bond | A customs bond covering all of an importer's entries for a year |
| Demurrage | Daily charge for a loaded container left at the terminal past free time |
| Detention or per diem | Daily charge for keeping a carrier's container outside the terminal past free time |
| Devanning | Unloading cargo from a container |
| Drayage | Short-distance trucking of containers to and from a port |
| Dual transaction | A terminal visit that returns an empty and picks up a load in one trip |
| Entry summary | The CBP Form 7501 data with classification, value and duties, filed after entry |
| FCL / LCL | Full container load, where one shipper fills the box, and less than container load, where several share it |
| Free time | Days allowed before demurrage or detention starts |
| FTZ | Foreign-trade zone, a CBP-supervised area where duty is deferred until goods enter U.S. commerce |
| General order | Status of goods not entered within 15 days, moved to a GO warehouse at the consignee's expense |
| HMF | Harbor Maintenance Fee, 0.125% of cargo value on ocean imports |
| HTS | Harmonized Tariff Schedule of the United States, which sets classification and duty rates |
| Importer of record | The party legally responsible for an import's entry, duties and compliance |
| In-bond | Movement of uncleared goods under bond, governed by 19 CFR Part 18 |
| ISF | Importer Security Filing, the 10+2 data filed 24 hours before loading |
| LFD | Last free day, the final day before demurrage starts |
| Liquidation | CBP's final computation of duties on an entry |
| MPF | Merchandise Processing Fee, 0.3464% of entered value with annual minimum and maximum |
| NVOCC | Non-vessel-operating common carrier, which issues its own bills of lading without operating ships |
| Pre-pull | Picking up a container before the receiver is ready and holding it at a yard |
| Street turn | Reusing an import empty for an export load without returning it to the terminal |
| Telex release | Electronic release of cargo without surrendering original bills of lading |
| Transloading | Moving freight from an ocean container into a domestic trailer |
| Triaxle chassis | A three-axle chassis that spreads a heavy container's weight to stay within axle limits |
Planning an import through Long Beach or Los Angeles?
We handle the physical side of San Pedro Bay imports from Long Beach: drayage on our own chassis, bonded drayage and a customs-bonded warehouse, CFS, transloading, warehousing and nationwide trucking, working alongside your customs broker. See how it fits together on our import logistics page or send us your shipment details.
Request a quoteFrequently asked questions
Is importing through Los Angeles different from importing through Long Beach?
The customs process is identical because both ports follow the same federal regulations and CBP procedures. The differences are practical: each port has its own terminals, appointment systems and empty return rules, and vessels sometimes shift between them. Many importers use both, so it pays to work with providers that serve both.
Can I import without a customs broker?
An importer of record can file its own entries in ACE, but most commercial importers use a licensed customs broker because classification, valuation, agency data and bond requirements are complex. Only a licensed broker can file entries for other parties as a business.
How long does it take for a container to clear customs at Long Beach?
If entry is filed before arrival with complete data, release often comes on or shortly after arrival. Holds, exams and agency reviews add days, and an intensive exam can add a week or more. Plan your pickup around the terminal's availability status, not the vessel arrival date.
What happens if my container is not picked up by the last free day?
Demurrage starts accruing daily at the terminal, usually at rates that rise the longer the container sits. If no entry is filed within 15 calendar days of arrival, the cargo can be sent to a general order warehouse at the consignee's expense.
What should I do if my entry is not ready when the vessel arrives?
Ask a bonded carrier to move the container in bond to a customs-bonded warehouse or CFS before the last free day. The goods stay under CBP control, demurrage stops, and the broker files entry when the paperwork is fixed.
Do I need a continuous bond or a single-transaction bond?
A single-transaction bond covers one entry and suits occasional importers. If you import more than a few times a year, a continuous bond is usually cheaper and simpler. CBP generally sizes it at 10 percent of the prior year's duties, taxes and fees, with a $50,000 minimum.
Who pays for a customs exam?
The importer pays the examination station's handling and the extra drayage, even if the exam finds nothing. Free time usually keeps running, so ask your drayage carrier to move the container to and from the exam station promptly.
Can I dispute a demurrage or detention invoice?
Yes. Under the FMC billing rule at 46 CFR 541, you have at least 30 days from the invoice to request a waiver, refund or mitigation, and the billing party has 30 days to respond. An invoice missing required information does not have to be paid.
Is a bonded warehouse or a foreign-trade zone better for deferring duty?
A public bonded warehouse needs no setup and allows storage for up to five years, which suits most importers. An FTZ has no time limit and allows more activity, including manufacturing with approval, but requires activation and an ongoing compliance program. High-volume, steady flows tend to justify an FTZ.
When should I transload instead of delivering the container directly?
Transload when the freight is going far inland, to several destinations, or needs palletizing or relabeling. Deliver the container directly when it is going to one receiver within a short drive of the port and can be unloaded quickly.