Port of Long Beach logistics, Southern California markets and nationwide trucking.
Get a quoteDrayage Services
Port container trucking from the terminal to your warehouse, with release checks, appointments, chassis and the empty return handled as one job.
What drayage services include
Drayage services move ocean shipping containers over short distances: out of a marine terminal to a warehouse, distribution center, container freight station or transload facility, and back to the terminal or a depot with the empty. For most imports it is the first truck move on U.S. soil, and for most exports it is the last.
The driving is usually the smallest part of the job. A drayage carrier has to confirm the container is released, get a terminal appointment, supply a chassis, deliver within the receiver's window and return the empty before the steamship line's free days run out. Every one of those steps has its own clock and its own charge if it slips.
This page explains how port drayage works in any U.S. gateway, how it is priced, and how to judge drayage companies before you hand them a container. For our local operations, see drayage at the Port of Long Beach and drayage at the Port of Los Angeles. For a plain-language primer, start with what is drayage.
Types of drayage moves
Drayage covers several distinct container moves. Naming the right one on a quote request avoids surprises on the invoice.
| Move | From → to | When it is used |
|---|---|---|
| Import delivery | Marine terminal → warehouse or DC | Standard port to warehouse trucking for a cleared import |
| Pre-pull | Terminal → carrier's yard, then delivery later | Receiver cannot take the container before the last free day |
| Shuttle | Terminal → nearby CFS, transload or storage yard | Freight will be unloaded, sorted or reloaded near the port |
| Export delivery | Shipper → terminal for vessel loading | Loaded export container must hit the terminal's receiving window |
| Empty return | Receiver → terminal or line-designated depot | Closes out the steamship line's per diem clock |
| Bonded (in-bond) move | Terminal → bonded facility under customs bond | Cargo has not yet cleared customs |
How port drayage services work, step by step
A clean import move follows the same sequence at nearly every container port.
- 01Release check
The container must be discharged and free of customs, steamship line (freight) and terminal holds. A good carrier checks this before dispatch, because a truck sent to an unreleased container is a wasted trip you may still pay for.
- 02Terminal appointment
Most large terminals require a truck appointment for import pickups. Appointment supply can be tight during vessel surges, so the carrier books as soon as the container shows available.
- 03Chassis
Every container rides on a chassis. The carrier either supplies its own or pulls one from a chassis pool or provider, which adds a daily charge and sometimes a separate trip to find equipment.
- 04Pickup and gate-out
The driver presents the container number and pickup reference, the terminal mounts the box on the chassis, and the truck clears the out-gate. Interchange paperwork records the container's condition at this point.
- 05Delivery
The container is delivered as a live unload, where the driver waits while you unload, or as a drop, where the loaded container is left on its chassis and picked up empty later.
- 06Empty return
The empty goes back to the terminal or depot the steamship line designates. The per diem (detention) clock stops only when the empty is accepted at that location.
How drayage services are priced
A drayage quote has a base rate plus a set of line items that depend on what actually happens during the move. These are the components to look for:
| Component | How it is usually billed | What makes it go up |
|---|---|---|
| Base (line-haul) rate | Flat per container, by origin and delivery zone | Distance, congested routes, delivery to remote areas |
| Fuel surcharge | Percentage of the base rate, indexed to diesel prices | Rising diesel prices |
| Chassis fee | Per day the container is on the chassis | Drop deliveries, slow unloading, long storage |
| Triaxle or overweight chassis | Per day or per move | Heavy containers that need an extra axle to stay legal |
| Waiting time | Hourly after free time at pickup or delivery | Long terminal lines, slow live unloads |
| Pre-pull and yard storage | Per move plus per day in the yard | Receiver not ready before the last free day |
| Dry run | Flat charge | Container not released or appointment missed after dispatch |
| Port program fees | Per container, passed through | Port-mandated programs such as clean-truck or traffic-mitigation fees |
A worked example of drayage cost
Example only, with round hypothetical numbers: a 40' import is quoted at a base rate of $500 plus a 30% fuel surcharge, so $650 before accessorials. The receiver asks for a drop, keeps the container three days on the carrier's chassis at $40 a day, and the carrier adds a pass-through port fee of $20. The move now costs $790.
Now suppose the receiver could not take delivery until two days after the last free day. The terminal charges demurrage for two days at a hypothetical $150 a day, adding $300. A pre-pull to the carrier's yard before the last free day, at a hypothetical $150 for the extra move and $50 a day for two days of storage, would have cost $250 and kept the container off the terminal.
The lesson is that drayage rates are rarely the biggest number. Free time, chassis days and the timing of the empty return decide most of the final bill, which is why our guides to demurrage and detention and the last free day matter as much as the rate sheet.
Live unload or drop: which delivery fits
The delivery type changes both the price and the risk. Use this as a starting point.
| Factor | Live unload | Drop |
|---|---|---|
| How it works | Driver waits while you unload, then leaves with the empty | Container left on chassis; driver returns later for the empty |
| Best for | Floor-loaded freight you can unload in about two hours, or palletized freight | Receivers with dock space and labor that varies day to day |
| Main cost risk | Hourly waiting time if unloading runs long | Daily chassis fees and a second truck trip |
| Per diem exposure | Low, because the empty leaves the same day | Higher, because the empty sits until the carrier is told it is ready |
| What you need | Labor and equipment ready at the appointment | Yard or dock space for a loaded chassis |
Rules that shape every drayage move
Federal rules and industry agreements set the limits drayage companies work within. These are the ones shippers most often run into:
- Hours of service. A property-carrying driver may drive up to 11 hours within a 14-hour window after 10 consecutive hours off duty, and needs a 30-minute break after 8 hours of driving unless a short-haul exception applies (49 CFR 395.3). Long terminal waits eat into the same clock.
- Weight limits. On the Interstate system, gross vehicle weight is capped at 80,000 pounds, with 20,000 pounds on a single axle and 34,000 pounds on a tandem (23 CFR 658.17). Heavy containers often need a triaxle chassis to spread the load legally.
- Equipment interchange. Most motor carriers that pull steamship line containers sign the Uniform Intermodal Interchange and Facilities Access Agreement (UIIA), which sets terms for equipment use and allows binding arbitration of per diem disputes.
- Demurrage and detention billing. Since May 28, 2024, the Federal Maritime Commission's rule at 46 CFR 541 requires ocean carriers and marine terminal operators to issue demurrage and detention invoices within 30 days and include specific information, or the billed party does not have to pay.
- Port programs. Many ports collect per-container fees tied to clean-truck or traffic programs. At the San Pedro Bay ports, the Clean Truck Fund rate started at $10 per TEU in April 2022, and the PierPass Traffic Mitigation Fee was $38.78 per TEU from August 2025.
What to send for a drayage quote
A complete request gets an accurate all-in number on the first pass. Include:
- Container number(s) and master or house bill of lading
- Port and terminal, if known, and the vessel's estimated arrival
- Container size and type (20', 40', 40' high cube or 45'; dry, reefer, hazmat, open-top or flat-rack) and gross weight, plus the commodity
- Delivery address, receiving hours and whether you want a live unload or a drop
- Customs status: cleared, or moving in-bond to a bonded facility
- The last free day and the steamship line's free days for the empty, if you have them
- Any next step after delivery, such as storage, unloading or transloading
How to choose among drayage companies
Rates are easy to compare. These questions separate carriers that protect your free time from carriers that simply move boxes:
- Do they check holds and availability before dispatch? Dry runs and missed appointments are usually avoidable.
- Can they get into the terminal? Federal rules at 33 CFR 101.514 require a Transportation Worker Identification Credential (TWIC) for unescorted access to secure areas of regulated port facilities, and some ports add their own truck rules; at Long Beach and Los Angeles every truck entering a marine terminal must be on the Port Drayage Truck Registry.
- Do they run their own chassis? Carriers that depend entirely on pool chassis can lose a day hunting equipment during busy weeks.
- Can they handle heavy containers? Ask whether they have triaxle chassis and how they confirm weight before pickup.
- What happens if your dock is not ready? A carrier with its own yard, warehouse or transloading operation gives you options besides paying demurrage.
- Can they move in-bond freight? Bonded drayage requires bonded carrier authority.
- How do they report status? You need pickup, delivery and empty-return confirmations without chasing them.
- Will they quote all-in? A low base rate with vague accessorials often ends up costing more.
Common drayage mistakes and how to avoid them
- Booking the truck after the vessel arrives. Appointment slots go quickly in surge weeks. Line up the carrier when the vessel departs the origin port.
- Treating the last free day as the pickup day. If the only appointment is on the LFD and it falls through, demurrage starts the next morning. Aim to pick up a day or two earlier.
- Forgetting the empty. Demurrage stops at gate-out, but per diem keeps running until the empty is returned. Tell the carrier the moment a dropped container is empty.
- Understating weight. An overweight container on the wrong chassis can be refused or fined. Share the true gross weight up front.
- Ignoring receiving hours. A drop or live unload booked outside your dock hours turns into waiting time or a redelivery charge.
- Leaving customs to the last minute. Have your customs broker file entry early, or plan an in-bond move. See our guide to in-bond shipments.
Where we provide drayage services
National Freight & Drayage is based in Long Beach, California, and runs drayage at the San Pedro Bay ports on our own 20' and 40' chassis, plus triaxle chassis for heavier containers. Our drivers carry TWIC cards and our trucks are registered for port terminal access. Our local pages cover Port of Long Beach drayage and Port of Los Angeles drayage in detail.
We pull 20', 40', 40' high cube and 45' containers, refrigerated (reefer) containers, hazmat containers (hazard classes confirmed per shipment at quote time), and open-top, flat-rack and overweight containers, with permits arranged when a move requires them. Reefers are delivered direct, since our yard has no reefer plug-ins for storage or pre-pulls.
Because our warehousing and container handling are also in Long Beach, a container does not have to go straight to its final destination. It can go into container storage, container unloading, our container freight station or bonded warehousing, then continue by full truckload or LTL anywhere in the U.S., or across the border to Canada and Mexico. When a long inland move suits rail better than truck, we can arrange rail or intermodal service through partners.
Get a drayage quote
Send your container numbers, delivery address and last free day, and we will come back with an all-in estimate and a plan for the empty. Call 888-718-9559 or request a quote online.
Request a drayage quoteFrequently asked questions
What is the difference between drayage and trucking?
Drayage is the short move of an ocean container on a chassis to or from a port terminal or nearby facility. General trucking usually means moving freight in domestic trailers over longer distances, by full truckload or LTL. Many imports use both: drayage to a transload or warehouse, then domestic trucking inland.
How are drayage rates calculated?
Most carriers charge a flat base rate per container by delivery zone, a fuel surcharge as a percentage of that rate, daily chassis fees, and pass-through port fees. Accessorials such as waiting time, pre-pulls, storage, dry runs and overweight handling are added when they occur.
What is a dry run in drayage?
A dry run is a trip where the truck reaches the terminal or delivery site but cannot complete the move, for example because the container is on hold or the appointment was missed. Carriers usually bill it as a flat charge, which is why release checks before dispatch matter.
How long does a live unload take?
Palletized freight often unloads in under an hour with a forklift. Floor-loaded cartons in a 40' container commonly take two to four hours depending on carton count and crew size. Most drayage rates include a short free window, then bill waiting time by the hour.
Who pays demurrage and per diem on a drayage move?
Demurrage and per diem are billed by the terminal or ocean carrier, usually to the consignee or the party that contracted for the shipment. A drayage carrier may pay and re-bill them, but the charges belong to the cargo side unless the carrier caused the delay.
Can drayage companies move containers that have not cleared customs?
Only carriers with bonded authority can move uncleared cargo, and only under an in-bond transaction to a bonded facility or another port. Under 19 CFR 18.1, in-bond merchandise generally must reach the destination port within 30 days.
How far does drayage go?
Drayage usually covers local and regional moves from the port, typically within the same metro area or a few hundred miles. For longer distances, transloading into a 53' domestic trailer is often cheaper and returns the ocean container sooner.
How does export drayage differ from import drayage?
On an export, the carrier picks up an empty from a depot or terminal, delivers it to the shipper for loading, and returns it loaded to the terminal. The key dates are the terminal's earliest receiving date and the cargo cutoff for the vessel. Arriving before the receiving window opens can mean storing the loaded container, and missing the cutoff can mean rolling to the next sailing.
What chassis do I need for a heavy container?
A standard tandem-axle chassis works for most loads. Heavier containers often need a triaxle chassis so axle weights stay within federal limits. Share the true gross weight when you book so the carrier assigns the right equipment.
Do you pull reefer, hazmat, open-top or flat-rack containers?
Yes. Along with 20', 40', 40' high cube and 45' dry containers, we pull reefers, hazmat containers (we confirm the hazard class for each shipment at quote time), and open-top, flat-rack and overweight containers, arranging permits when required. Reefers move direct to the receiver because we do not have reefer plug-ins for yard storage.

